Laguna Beach Road Work Guide January 2020

Road Construction by southocbeaches.com

The City of Laguna Beach will be repairing roads and facilities around the City in the month of January 2020.

January 15 2020 thru February 26 2020: Laguna Canyon Road Slope Repair
Hours: 7:30am to 5:00pm on Monday through Friday
Caltrans plans to begin slope stabilization work on the west side of Laguna Canyon Road between Canyon Acres Drive and Woodland Drive to address the December 26 rainstorm damage.
The work consists of removing loose rocks/debris and replacing the damaged steel mesh blanket that protects the road.
Minor traffic and noise impacts are anticipated.
Please direct any questions to Caltrans Project Manager, John Nowak, at (949) 279-8511.

Tuesday January 21 2020: North Laguna Striping and Repainting

Orange County Striping, will be repainting curbs and refreshing the roadways striping throughout North Laguna.
No parking or traffic impacts are anticipated during the work.
For questions, please contact Maintenance Leadworker, Todd Henry at (949) 497-0348.

Tuesday January 21 2020 thru March 31 2020: Riddle Field Electrical Modifications
Hours: 8:00am-2:30pm on Mondays thru Fridays
During construction, a small area adjacent to the snack bar will be closed to the public.
For additional information, please contact Matt Oxford, Project Manager, at (949) 497-0792 or moxford@lagunabeachcity.net.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.